Detamachi Pier

Last updated date : 2021/5/14

Photograph of Detamachi Pier
Detamachi Pier


Construction of Detamachi Pier began in 1952 and four berths ( a total berth length of 516m ) were completed in 1963 This pier has transit sheds with fumigation and controlled temperature facilities especially for bananas and fruits/vegetables. It is the main unloading site for fruits and vegetables including bananas and pineapples, so that the pier is sometimes referred to as " the banana pier

<Access>
minutes แบบ Detamachi Futo Junction on Route 15 2

<Area>
25.5ha

Outline of Facilities
PierBerthBerth Length(m)Depth(m)
DetamachiA1357.5
DetamachiB1357.5
DetamachiC1237.5
DetamachiD1237.5