Main content starts here.
Detamachi Pier
Last updated date : 2021/5/14
Detamachi Pier
Construction of Detamachi Pier began in 1952 and four berths ( a total berth length of 516m ) were completed in 1963 This pier has transit sheds with fumigation and controlled temperature facilities especially for bananas and fruits/vegetables. It is the main unloading site for fruits and vegetables including bananas and pineapples, so that the pier is sometimes referred to as " the banana pier
<Access>
minutes แบบ Detamachi Futo Junction on Route 15 2
<Area>
25.5ha
Pier | Berth | Berth Length(m) | Depth(m) |
---|---|---|---|
Detamachi | A | 135 | 7.5 |
Detamachi | B | 135 | 7.5 |
Detamachi | C | 123 | 7.5 |
Detamachi | D | 123 | 7.5 |
Jump to
Page ID : 767-808-333